This article has been written in my LinkedIn blog. https://www.linkedin.com/pulse/yes-bim-sabu-francis Excerpt: Even if the term BIM is new, fair amount of theoreticians have been asking the central question: Shouldn’t we have a 3D model that captures the entirety of a building — and not just the visual data but also the embedded information? In a small town in India (Navi Mumbai), I was extending this question: Instead of just having a static model — shouldn’t we be having a set of neutral, abstract alphabets to capture a dynamic model, which not only captures the final design but also need to capture the entire process of designing?